Engineering firm Aker Solutions has secured a letter of award (LOA) from PTSC Mechanical and Construction (PTSC M&C) to deliver detailed design services for the redevelopment of Qatar’s offshore Maydan Mahzam oil field. Aker Solutions described the contract as “sizeable,” valuing it between NOK 0.5 billion and NOK 1.5 billion.
The scope of work covers detailed engineering for three primary topsides, four jackets, and brownfield tie-in modifications. Aker Solutions will execute the design package using its engineering hubs in Mumbai, India, and Kuala Lumpur, Malaysia.
Located roughly 100 km (62 mi) off the Qatari coastline and 28 km (17 mi) southeast of Halul Island, Maydan Mahzam sits in water depths of around 40 m (131 ft). Initially discovered during the 1960s alongside the neighboring Bul Hanine field, it has been active since 1965. Operator QatarEnergy is driving a comprehensive redevelopment strategy to modernize infrastructure and prolong field life, awarding PTSC M&C a core scope within the initiative.
“This award reflects the strength of our engineering organization and our long track record of delivering complex offshore projects,” stated Guro Rausand, executive vice president of new build at Aker Solutions. “Together, we look forward to supporting the successful execution of the Maydan Mahzam project.”
Final contract signing remains pending following the LOA. Upon formal execution, Aker Solutions anticipates logging the order intake within its Renewables and Field Development division during Q4 2026.
