KBR has finalized the hull and marine systems engineering for Aibel’s concept study of Equinor’s Wisting FPSO, located in the Barents Sea. The finished design package is prepared for shipyard distribution, facilitating the project’s transition into the Front-End Engineering Design (FEED) stage, which Equinor recently assigned to Aibel.
Building on earlier iterations, KBR tailored the layout to satisfy Equinor’s technical criteria, managing naval architecture, structural components, marine systems, and space planning. Given the harsh operational conditions of the Barents Sea, the hull underwent rigorous wind tunnel and model basin testing. Using a 1:60 scale prototype, engineers confirmed the vessel’s hydrodynamic stability and validated its ability to shield crew quarters from green water during severe weather, including 10,000-year wave events reaching nearly 21 meters (69 feet).
Richard Rippon Swaine, Vice President for Europe, Africa, and Caspian at KBR, stated that merging KBR’s hull design capabilities with Aibel’s project insights resulted in a durable, shipyard-ready design tailored for extreme environments.
Aibel President and CEO Mads Andersen noted that the initial concept design played a critical role in securing the Wisting FEED contract and expressed enthusiasm for continuing the collaboration with KBR through the upcoming phase.
